The build sequence

Every home follows the same order: site work and foundation, framing, mechanicals, insulation and drywall, finishes, and final inspections. Knowing the sequence matters because it’s what your draw schedule and milestone payments hang on. Money should follow completed stages, never precede them.

Milestone payment discipline

0/5
Never pay ahead. Your leverage is the checkbook.

The relationship with your builder

A good builder manages every sub so you don’t have to. Your job is to make the budget and schedule visible, verify milestones, and make decisions fast when the site needs one. That’s the whole partnership.

Ready to stop watching and start building?

Join the BuildUp Challenge and book a call with our team.

Join the BuildUp Challenge

Watch more on Ruben's channel.

Common questions

Do I need a license or construction experience to build a house?

No. Ruben has built 250+ homes and Arthur has developed 1,000+ lots without carrying a license between them. You hire the professionals: a drafter, a structural engineer, a surveyor, a builder, a loan officer, and a listing agent. Your job is finding the deal and making the numbers work.

How do I check whether a lot's sewer can support my house?

Find the location, depth, and diameter of the sewer main. Your jurisdiction publishes a table showing the minimum lateral size for a given bedroom or bathroom count, often a 4 inch minimum. For septic instead, confirm the lot is physically big enough and get a perc test to prove the soil will accept it.

How much does a builder charge to run the project?

Cost plus a fee of about 10%. On a $500,000 build that is $50,000 to manage the entire schedule start to finish. That fee has to be inside your underwriting from step two, not discovered later, and it is the reason you do not need a license of your own.

What is the most expensive mistake during construction?

An empty job site. Someone should be working every weekday. A site that sits idle is still accruing interest, and across a six month project that can quietly cost $5,000 to $20,000 in interest alone. The fix is scheduling subs and ordering material ahead of time.

What do I owe in taxes when I sell?

If you lived in it at least 2 of the last 5 years, up to $250,000 of gain is exempt filing single and up to $500,000 filing jointly. If you sell right away you owe capital gains on the profit, and it does not come out of the sale proceeds. It comes out of your bank account at tax time, so set it aside.

Nationwide

Where our clients are building.

65+ active member builds, 300+ units in progress, across 20+ states. Click a market to see who is building there.

346

Units developing live

49

Markets

Map of the United States showing where BuildUp clients are developing
See all developments

Your next step

Where are you right now?

New to development

Start with the BuildUp Challenge

A step-by-step challenge to line up your first deal, with our team beside you.

Join the Challenge

Live every week

Join the weekly live masterclass

Arthur and Ruben break down real deals and answer your questions in a live Q&A.

Join the live masterclass

Ready to build

Talk to our team

Development consulting for people ready to put a real deal together now.

Explore consulting